-
Recent Posts
Recent Comments
Archives
Categories
Meta
Monthly Archives: September 2015
Construction of “The Beetle” has began
Slab, walls and spans are all mounted with the “Styrostone” system. The concrete is injected into the previously reinforced and raised “hollow” wall (in fact, it’s an assembly of EPS “Styrostone” blocks). Therefore all the facings are concrete reinforced and isolated … Continue reading
Posted in Uncategorized
Leave a comment